Perform basic field infrastructual maintenance in a conservation area

Basic field infrastructure maintenance in a conservation area

SAQA US ID: 252450

Q- Specific outcomes 1:
Are there any faulty or problematic field infrastructure?

A- Yes, there is a faulty Hide by the maroela entertainment area where the Hide is in a really bad condition and needs urgent attention and some re-varnishing!

AC1: An explanation is given of the role regular maintenance plays in preserving the life of field infrastructure.
Ø  The pro’s of maintenance

AC2: An outline is provided of the implication of not carrying out maintenance timeously
Ø  The cons of maintenance.

AC3: Field infrastructure requiring maintenance is identified in the area of operation.
Ø  ID infrastructure: Windmills, road paths, fences, dam, pumps.

AC4: A self-assessment is made of whether the required repair or maintenance work is within or above the learner’s designated scope of accountability.
Ø  Self assessment(Know what’s your scope)
AC5: An assessment is made of the current condition of field infrastructural elements within a conservation area.
Ø  Current condition of content.
Specific outcomes 2:(Report)

AC1: A written report on required maintenance work for field infrastructure is prepared for management as it relates to identified maintenance requirements.
Ø  Report-Verbal, Written, or both.
AC2: Management is alerted regarding work falling outside of the learners designated scope authority.
Ø  Do work that is in your scope.
Specific outcomes 3:(Maintain/Repair)

Carry out basic repair work to infrastructure.

AC1: Authorisation is obtained to carry out basic repair work within designated scope authority.
Ø  Authorisation- Get Authorisation from your senior.
AC2: The required tools, physical resources and labour are obtained in order to complete the work successfully.
Ø  Tools- Sign in, Book out, picking slip.
AC3: Tools and materials are used, maintained and stored correctly.
Ø  Tools- Stored safely.
AC4: Work is completed to the required standard.
Ø  Do work properly
Specific outcomes 4:( Identify problems & Suggestions)

AC1: An assessment is made of the repair work to field infrastructure in (SO3) as it relates to the effectiveness and efficiency of physical and human utilisation.
Ø  Show work is done properly.

AC2:A report is prepared outlining suggestions for improvement in future maintenance of field infrastructure.
Ø  Make suggestions so that it wont happen again and discus with your fellow workers and seniors.

No comments: